Here at RHUGED FLOORS we take steps to go above and beyond our competition.
It is critical in what we do to properly prepare the concrete, as well as how close we can get to walls which with our equipment is 1/8 inch.
Our Process:
Step 1: We began by removing the paint from the floor, or prepping the concrete by grinding to reveal the raw concrete surface.
Step 2: At the homeowner's request, we eliminated the sawcut control joints by filling them with a non-shrinking crack filler.
Step 3: After curing, we ground the filled joints flush with the concrete slab, applied a bonding agent, and broadcasted polymer flakes onto the floor.
Step 4: Ensuring levelness and flatness, we scraped the flakes.
Step 5: Finally, we applied two top coats of polyaspartic with UV blocker for added protection.